Project Scheduler - Houston, United States - Radiant company

Radiant company
Radiant company
Verified Company
Houston, United States

3 weeks ago

Mark Lane

Posted by:

Mark Lane

beBee recruiter


Description
Pay rate is $ 70/hr

Hybrid Role


Title:
Project Scheduler


Location:
Houston TX 77024


Duration: 10 Months

Estimated Start Date:
ASAP


Assignment Length:
TBD based on performance and workload

Est Hours Per Week: 40


Work Schedule + Time Zone:
Standard business hours, Central Time Zone


Temp to Hire (Y/N)? TBD... this remains the same

Assignment Location:
Houston; Location may change to jobsite if assignment continues

Remote or Onsight? 3 days office, 2 days home; fulltime at jobsite once Construction phase begins


Confirm local rates of production for determination of budget manhours & schedule duration
Minimum 10 years experience in EPC project scheduling

Minimum 5 years experience of full-time jobsite scheduling

Ability to plan Engineering, Procurement, Construction, and Commissioning

Ability to read and understand Plot Plans, PFDs, P&IDs, One-Line Diagrams

Proficient with Primavera P6 scheduling software, including multi-file group projects

Experience with Physical Progress and Earned Value measurement systems


JOB SUMMARY
The Project Scheduler is responsible for planning, scheduling, and progress reporting in support of proposals and projects.

Duties will typically be performed within an office setting during the Proposal and Engineering phases and then on site during Construction and Commissioning.

On-site work is planned in the near future and, therefore, a requirement for this position.


ESSENTIAL DUTIES AND RESPONSIBILITIES

General:
Provide necessary information for establishing time objectives to meet project requirements

Coordinate client, engineering, and operations interfaces to ensure smooth and timely flow of information

Provide project management with information pertinent to the control of the project


Basics:

Develop, maintain, and communicate the project time schedule

Use the project time schedule to drive the execution and timely completion of the project

Work in accordance with Air-Liquide scheduling procedures and requirements

Capture REX (Return of Experience) to promote continuous improvement

Contribute actively to the knowledge exchange within the Scheduling Team


Proposal Phase:

Participate in the execution strategy and develop the frame schedule

Challenge the duration and sequence-of-development / constructability

Prepare the Basis of Schedule, including clear and specific assumptions

Prepare the Project Schedule Execution Plan

Utilize REX analysis and knowledges for support during the client negotiation phase


Project Baseline:

Establish, maintain, and follow up plans and progress in accordance with internal procedures

Develop baseline progress schedule using existing templates and/or reference projects

Revise and/or assign activity codes & WBS structure for baseline progress schedule

Revise and/or develop required layouts for baseline progress schedule

Revise and/or assign resources for baseline progress schedule

Revise and/or load manhours, quantities, and cost into baseline progress schedule

Develop baseline progress curves using both early and late finish dates

Develop progress measurement tables for tracking of deliverables &/or quantities installed

Prepare SMART presentations to discuss, summarize and validate the planning assumptions and basis


Project Execution:

Collect progress status from client, engineering, operations, suppliers, and third party entities

Assist the technical team with internal schedules to control and monitor key tasks.

Prepare forecast schedules based on actual project status and anticipated evolution

Track the internal and external milestones versus the contract, target, and previous forecast

Update progress curves using both earned and remaining (forecast) values

Analyze critical path(s), schedule variances, progress trends, and resource allocation

Develop and implement solutions / mitigation strategies for identified critical scenarios / problems

Communicate status and analysis to project team via schedule layouts, written narrative, and briefings

Assist in the preparation of weekly and monthly reports

Keep a record of changes to the schedules via backup copy and "Maintain Baseline" function in P6

Update the Bases of Schedule, including mitigation actions taken in the monthly update


Construction:

Assist the site manager and subcontractor manager with planning

Perform quantity takeoffs

Confirm local rates of production for determination of budget manhours & schedule duration

Refine standard Schedule Specification for each ITB (Invitation to Bid)

Review subcontractor schedules for adherence to project specifications and need dates

Understand and challenge the subcontractors' plans before implementation into the main schedule

Import subcontractor schedules into the master progress schedule and make necessary logic ties

Walk jobsite and evaluate physical progress

Review accuracy of subcontractor schedule updates and adherence to their initial