Software Developer 3 - Austin, United States - LanceSoft

    Default job background
    Description

    DESCRIPTION OF SERVICES

    Texas Health and Human Services Commission requires the services of
    2 Software Developer 3, hereafter referred to as Candidate(s), who meets the general qualifications of
    Software Developer 3, Applications/Software Development and the specifications outlined in this document for the
    Texas Health and Human Services Commission.

    All work products resulting from the project shall be considered "works made for hire" and are the property of the
    Texas Health and Human Services Commission and may include pre-selection requirements that potential Vendors (and their Candidates) submit to and satisfy criminal background checks as authorized by Texas law.


    Texas Health and Human Services Commission will pay no fees for interviews or discussions, which occur during the process of selecting a Candidate(s).

    Hire a Tableau Developer through ITSAC to lead the transition of all of the OIG dashboards from the virtual machine (desktop computer in the IT computer farm) to Tableau Server with the new AMD vendor.

    The Tableau server will transfer to Client on 9/1/2023 and we would like to move the remaining OIG dashboards to the same Tableau Server (12 remaining dashboards) shortly after the transition.

    The dashboards are located on a virtual machine which requires staff to utilize Tableau Reader to view the dashboards.

    Moving them to Tableau Server will allow direct connection to the source data, auto updates, speed up rendering time (display of the dashboards), and allow for exporting and printing data from the dashboards.

    This position will also assist OIG is redesigning existing dashboard to make them easier to navigation and for faster rendering.


    Hire a SharePoint Developer through ITSAC to assist in the redesign of the OIG SharePoint site.

    The OIG SharePoint site is currently maintained one FTE in Data Operations that has multiple other data support duties and is unable to block off dedicated time to improve and modernize the OIG SharePoint sites.

    The SharePoint site is utilized by all of OIG (and some external users for the EDT site) so updating the site is a high priority for Data Operations.